The largest MTS PJSC data center with 2 240 racks. Constructed using best engineering and technological solutions.

16 isolated server rooms with total space of 6 300 sq. m. and power input of 11 Mwatt can help solve any tasks connected with equipment layout.

Find out more
Core services
Colocation
Colocation
  • A combination of colocation and racks use allows to implement any #CloudMTS hybrid solution
  • 300 watt power supply already included in rental of 1 unit
Racks rental
Racks rental
  • Functional rack dimensions: 750mm*1200mm Schneider Electric
  • Rack height is 42/48U
  • A rack, PDU APC and vertical cable managers already included in the cost of service
Module rental
Module rental
  • Dedicated Schneider Electric module with limited access to it
  • Module height is 42/48 units
Containment solutions rental
Containment solutions rental
  • Organize a data center inside of a data center
  • 396 sq.m space
  • Customized solutions
Client racks placement
Client racks placement
  • Maximum dimensions of racks: H – 2000mm W – 800mm G – 1200mm
  • Power connection to IEC-309 connectors
  • Various power charging schemes (tariffs)
Additional services
#CloudMTS cloud
#CloudMTS cloud
Information security services
Information security services
Data transfer services
Data transfer services
For your convenience
Office and parking space rental
Office and parking space rental
Partition
Partition

Various partition options available to meet the technical requirements of your clients

Functional loading area
Functional loading area

Loading area has two gates with hydraulic platforms with a lifting height of up to 1m

IT consulting
IT consulting
  • Equipment migration
  • Modernization of the existing software-hardware solution of your Clients
  • Consulting services
Tech specs
  • Power grid
  • Cooling
  • Safety measures
  • Fire safety
  • Data transfer service and network

Power grid

  • 2 independent external electrical inputs
  • HiTec DRUPS power modules at full capacity of data center equipment
  • Power supply system of data center main technological process constructed according to the 2N redundancy system
  • Total useful power capacity of the data center is 11.2 MW
  • Total electric power of the data center is 20 MW